A Virtual Travel Game on the Oculus Quest 2
Virtual reality travel games tend to be visually stunning but lack interactivity and the freedom to move about. Camp Adventure aims to be a playground set within the surroundings of an actual landmark - the Camp Adventure tower in Denmark - where users are free to explore different activities while charting their own path to the tower.
Gradual reveal of the tower for all 3 lanes
Layout sketch of the entire level
Level flowchart - players can switch lanes midway through the journey
Gradual reveal of the tower for all 3 lanes
Layout sketch of the entire level
After taking one of the ziplines, players will be near the tower
The Tower is gradually revealed as the player gets closer
Lane 1: Tower is obstructed by fog and landscape to encourage exploration
Lane 1: Obstacle course is partially visible after walking on the boardwalk to tempt players into taking a different path
Lane 1: Tower is fully revealed after a long walk
Lane 2: On the obstacle course, monkey bars provide an elevated vantage point of the tower and the routes leading to it
Lane 3: Path ahead of rock climbing wall on the right lane is more heavily obscured to encourage players to explore other paths first
Lane 3: Players are rewarded with a clear view after a challenging climb to the top of the rock climbing wall
After taking one of the ziplines, players will be near the tower
The Tower is gradually revealed as the player gets closer
Camp Adventure's climbing park and boardwalk was the inspiration behind the gameplay features. As I wanted to design for non-VR veterans, I picked features that work with VR hand controllers (as opposed to full-body tracking) and are not too physically demanding.
While I hoped that all users would try climbing and ziplining, I was mindful of players who want to stick to walking. For these players, it's important to provide enough variation in their journey - this led to the different lanes that you saw earlier.
I wrote most of the game in C++, starting with reusing snippets from this Git project that I was learning from in this Unreal Engine C++ course for VR by GameDev.Tv. See Git (this repo is incomplete as I quickly ran out of space).
The initial plan for the zipline involved a harness and carabiner so that players feel safe to fly. To prevent scope bloat, a simpler design was chosen after seeing playtesters activating the zipline without hesitation.
Most players charged towards the tower; fog and landscape mass were added to encourage exploration of the 3 lanes to the tower
Unlike the actual place, the tower is placed east relative to the start location to allow a consistent line of sight for all 3 lanes
As expected, the size of the real-world location (400m x 1200m) was too big. The final scale is 1/5th. The landscape didn't look too sparse at this scale and the walking speed could be lowered to prevent motion sickness
Metrics of ladders, trees and even the ramps have to be increased by 40% for VR
The initial plan for the zipline involved a harness and carabiner so that players feel safe to fly. To prevent scope bloat, a simpler design was chosen after seeing playtesters activating the zipline without hesitation.
Most players charged towards the tower; fog and landscape mass were added to encourage exploration of the 3 lanes to the tower
Using Blender and Substance Painter, I created the following assets: